BARKEATER TRAILS ALLIANCE
  • HOME
  • ABOUT
    • Who We Are
    • History
    • Annual Reports
    • Board of Directors
    • Staff
    • Community Partners
    • Blog
    • Gallery
    • Contact Us
  • DONATE
  • BIKE TRAILS
    • Bike Trail Conditions
    • Ride With Gratitude
    • Wilmington >
      • Flume Trails
      • Hardy Road (Beaver Brook)
      • Three Sisters (Quaker Mountain)
    • Lake Placid >
      • Lussi Trails
      • Loggers Loops
      • Craig Wood Trails
    • Saranac Lake >
      • Dewey Mountain
      • Mount Pisgah
      • Fowler's Crossing
    • Elizabethtown >
      • Otis Mountain
      • Blueberry Hill
    • Keene
  • SKI TRAILS
    • Conditions
    • Jackrabbit Ski Trail >
      • Lake Clear JCT to Pauls Smith's VIC
      • Saranac Lake to McKenzie Pond Road
      • McKenzie Pond Road to Whiteface Inn
      • Whiteface Inn to Mirror Lake
      • Mirror Lake to ADK Cascade Trails
      • ADK Cascade Trails to Keene
  • EVENTS
    • Wilmington MTB Festival
  • VOLUNTEER
  • MERCH

Trail Work Updates: Our Plans Include...

7/31/2025

0 Comments

 
There is always something cooking at BETA.  Right now, some of the projects on our horizon include the following.

​ELIZABETHTOWN
  • Blueberry Hill: The machine built section of the new climbing trail is complete.  Dusty and Scott are continuing with the handwork to finish the trail in the next couple of weeks. This volunteer- and pro-crew-built trail offers an easier alternative to Hemlock for climbing and returning to the trailhead off of Bronson Way. 
  • Cobble Hill: We’ll have new signage installed here soon.  Great timing since we’ll be riding there on August 12th for our next Slow Your Roll Ride!
 
KEENE
  • East Branch Community Trails, on top of the two new trails already opened this season, we have:
    • Peduzzi Trail Building has begun construction of a climbing trail and descent trail above the power lines.  That’s right, we’re starting on a whole new section of ground for these trails and adding more elevation!  If all goes according to plan, the new trail will be open before October, just in time for the UCI World Cup.
    • The Skills Loop is currently rideable and we are working with Peduzzi and local volunteers to plan and build technical trail features to help riders advance their skills in a controlled environment. 
  • Jackrabbit Trail: The Rock and River trailhead to access the JRT is moving forward.  Construction is done on the parking lot and work on the trail and bridges will be happening over the next few months.  Stay tuned for volunteer work parties there this fall. 
 
LAKE PLACID
  • Craig Wood/Scott’s Cobble: 
    • As we mentioned in our last update, Dusty, Scott, and an amazing brigade of volunteers finished the climbing reroutes on Back Nine.  It has really improved the riding experience in that section and simultaneously made the trail much more sustainable against heavy rains and erosion.
    • On August 17th, the Lake Placid Outing Club (LPOC) and BETA are teaming up to bring kids in LPOC and their families out for a volunteer trail work party at Craig Wood, Lake Placid.  Not only is it fun, volunteering is also a great way to cultivate a sense of stewardship, respect, and gratitude for the amazing trails we have at our fingertips.  This work party is only open to members of LPOC and their families.  Register here.
  • Jackrabbit Trail: 
    • If time permits, we’ll replace the stringers on the bridge at the bottom of the JRT near River Road this fall.  We have temporarily patched the one at risk of failure to get us through the upcoming winter if we don’t get to the replacement this season.
    • ​A reroute of the JRT to that will take us off of part of Mountain Lane is approved and will be constructed in late fall during the chainsaw window.  This is a sizable undertaking and we hope to host a few volunteer trail work parties to tackle some aspects of this project.  Stay tuned for more details as summer draws to a close.

SARANAC LAKE
  • Mt. Pisgah: 
    • We’re working with the folks at Cure Cottage Development LLC in order to create a new access trail route from Park Ave to Mt. Pisgah that accommodates their plans for development of Trudeau Village, a major project to renovate the former Adirondack Cottage Sanitarium and create affordable housing in Saranac Lake.
    • On Monday, July 28th, the Saranac Lake Village Board voted unanimously to approve and sponsor BETA’s Mt. Pisgah Summer Trails Enhancements and Master Plan.  We will keep you posted on what that means for Mt. Pisgah – look forward to more information in our next newsletter and as we try to secure funding for the work.
    • A volunteer trail work party with the Saranac Lake Innovative Cycles Kids (SLICK) will be held at Mt. Pisgah on Sunday, August 17th.  Kids and their families, regardless of their involvement with SLICK, are encouraged to join in on this fun and gratifying activity.  Register here.
  • Dewey: We hosted a volunteer trail work party at Dewey on July 24th sponsored by Silver Birch Cycles and have another one on the calendar for August 25th sponsored by Bike Adirondacks.  These evening work parties focus on brushing, root removal, clearing drainages, and treadwork in a few sections.  Register for the next work day here.

WILMINGTON
  • Three Sisters: A new route for the Town Connector has been flagged and approved from Outlook Lane to Three Sisters with construction planned for 2026.  This reroute will help preserve recreational access between the Wilmington Recreation Town Park and Hardy Road even as development proceeds on private property in the area. We are thankful to the landowner for his support of our effort to maintain access!
  • Hardy Road: Right now Dusty and Scott are putting the finishing touches on a bit more work on All In for the season.  Meanwhile, we are finalizing the trail conditions assessment in order to produce a recommendation of Hardy Rd trail work for DEC review and approval for 2026.  That’s right, we’re already looking ahead to 2026 so we can hit the ground running next trail season.
0 Comments

Your comment will be posted after it is approved.


Leave a Reply.

    UPCOMING EVENTS
    Stay tuned!

    Archives

    November 2025
    July 2025
    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    June 2024
    May 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    June 2023
    March 2023
    February 2023
    January 2023
    November 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022

    Categories

    All

    RSS Feed

    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture

BARKEATER TRAILS ALLIANCE (BETA)
volunteer driven - member supported - human powered


Address

P.O. Box 843 - ​Lake Placid, NY 12946

Telephone

518.523.1365

Email

[email protected]
Privacy Policy
  • HOME
  • ABOUT
    • Who We Are
    • History
    • Annual Reports
    • Board of Directors
    • Staff
    • Community Partners
    • Blog
    • Gallery
    • Contact Us
  • DONATE
  • BIKE TRAILS
    • Bike Trail Conditions
    • Ride With Gratitude
    • Wilmington >
      • Flume Trails
      • Hardy Road (Beaver Brook)
      • Three Sisters (Quaker Mountain)
    • Lake Placid >
      • Lussi Trails
      • Loggers Loops
      • Craig Wood Trails
    • Saranac Lake >
      • Dewey Mountain
      • Mount Pisgah
      • Fowler's Crossing
    • Elizabethtown >
      • Otis Mountain
      • Blueberry Hill
    • Keene
  • SKI TRAILS
    • Conditions
    • Jackrabbit Ski Trail >
      • Lake Clear JCT to Pauls Smith's VIC
      • Saranac Lake to McKenzie Pond Road
      • McKenzie Pond Road to Whiteface Inn
      • Whiteface Inn to Mirror Lake
      • Mirror Lake to ADK Cascade Trails
      • ADK Cascade Trails to Keene
  • EVENTS
    • Wilmington MTB Festival
  • VOLUNTEER
  • MERCH
Live Chat Support ×

Connecting

You: ::content::
::agent_name:: ::content::
::content::
::content::