BARKEATER TRAILS ALLIANCE
  • HOME
  • ABOUT
    • Who We Are
    • History
    • Annual Reports
    • Board of Directors
    • Staff
    • Community Partners
    • Blog
    • Newsletter Sign Up
    • Contact Us
  • DONATE
    • Give Today
    • Legacy Giving
  • BIKE TRAILS
    • Bike Trail Conditions
    • Ride With Gratitude
    • Wilmington >
      • Flume Trails
      • Hardy Road (Beaver Brook)
      • Three Sisters (Quaker Mountain)
    • Lake Placid >
      • Lussi Trails
      • Loggers Loops
      • Craig Wood Trails
    • Saranac Lake >
      • Dewey Mountain
      • Mount Pisgah
      • Fowler's Crossing
    • Elizabethtown >
      • Otis Mountain
      • Blueberry Hill
    • Keene
  • SKI TRAILS
    • Conditions
    • Jackrabbit Ski Trail >
      • Lake Clear JCT to Pauls Smith's VIC
      • Saranac Lake to McKenzie Pond Road
      • McKenzie Pond Road to Whiteface Inn
      • Whiteface Inn to Mirror Lake
      • Mirror Lake to ADK Cascade Trails
      • ADK Cascade Trails to Keene
  • EVENTS
    • Hardy Kids MTB Race 08/29
    • Pedal & Potluck 08/29
    • Best Day Ever Film Screening 09/18
    • Community Bike Jam 10/02
  • VOLUNTEER
  • MERCH

Avoiding Conflict: Back Nine Trail Reroute

9/3/2026

0 Comments

 
​Check out the reroute 👀

BETA trail crew duo Dusty and Scott, with support from our Trail Stewardship Leader Chris, rerouted a section of Back Nine trail in Craig Wood, Lake Placid earlier this season. A lot of our reroutes are to create a more sustainable path (switchbacks instead of fall lines), to avoid sections that have turned out to have poor soil for riding (aka they don't dry out quickly), or to deal with changes to the land use (like the reroute we're building right now for the Town Connector Trail in Wilmington). This reroute is different -- it's the avoid a trail use conflict.

Previously, the 50/50 Drop landed squarely on Back Nine. With limited visibility and high speeds in multiple directions, this trail intersection needed an alternative.

Now, the reroute swings Back Nine wide to avoid the landing area for the 50/50 Drop. We can keep riding the same rad trail, the same gnarly drop, but now with a little more peace of mind.

Amazing work as always, fellas!
0 Comments

Climbing Trail at Craig Wood Complete

8/21/2026

0 Comments

 
​Craig Wood has a new climbing trail thanks to the hard work of BETA's trail crew: the unstoppable Dusty & Scott.

This trail was quite the undertaking. It's been under consideration since the jump trails Green and Gold Jacket were built by Backslope Trail Building in 2023. Over the last couple of years, we spent time identifying and flagging the climbing route. For 2026, the Lake Placid Local Trails Committee (LTC) in partnership with BETA staff identified this project as a priority for work. Trail crew spent about 5-6 weeks at Craig Wood working on the climbing trail as well as a reroute of Back Nine around the landing of the 50/50 Drop. Now, after a lot of hard work from a lot of people, we have a climbing trail ready for lapping Green or Gold Jacket.

This is our first season with our brand-new, community-funded YARDMAX mechanized wheel barrow. It made a huge difference on this project to haul material from where we could find it in the woods to where we needed it on the trail. Thank you to everyone who helped us reach that funding goal back in May, and a special thank you to RP Ledger Construction for sponsoring the YARDMAX specifically. Your gifts are going to good use!
0 Comments

Volunteers: They're Crushing It

8/18/2026

0 Comments

 
Since our last e-news blast in mid-July, we've hosted four volunteer trail work parties led by Chris, our Trail Stewardship Leader.  We still have at least one more scheduled for this season, so if you want to volunteer with us but haven't had the chance yet, there is still time.  Not to mention, ski trail work will be starting soon...

Without further ado, a rundown of the awesome work volunteers have done in just the last couple weeks:
07/23 | East Branch Community Trails
We hosted two work sessions on July 23rd, one for the Keene Diversity Advisory Committee and another for the general public. Both sessions worked on finishing tweaks to make the existing trails at East Branch Community Trails adaptive-friendly.

Interested in learning more about adaptive-friendly riding and its impact? Don't miss BETA & Silver Birch Cycles' screening of the documentary film Best Day Ever on September 18th at The Annex, Arts Center Lake Placid.
GET YOUR TICKETS

Picture
07/25 | East Branch Community Trails
Our main focus on the 25th was to clear brush from the corridor of Trail 8. 

Reminders:
As of 08/20, Trail 8 is still under construction and not yet open for riding. Riding trails while they're still closed can make construction take even longer -- please help us get Trail 8 open ASAP by refraining from riding it for now ❤️

Update:
Trail 7 is now re-opened after a temporary closure due to nearby construction on Trail 8.

08/10 | Craig Wood, Lake Placid
Great turn out for this work party sponsored by Capisce Coffee and Espresso Bar. We lopped branches, cleared blowdown, made tread improvements, and cleaned out drainages. Especially gnarly were the culverts nearly full to the top with sediment. It's a good thing we cleaned them out --  it started to rain right as we left!
Picture
Picture
WHAT'S IT ALL FOR?
Volunteer workdays like these can vary widely in what, exactly, we work on, but they are all important to keep the trails we love in good working condition or to keep new trail construction moving forward with speed.

Some people feel a duty to give back to the trails through volunteering, while others find it satisfying and rewarding in its own right. Some feel both -- that it is a responsibility and a joy to warm your muscles doing hands-on work for the good of the trails and the people who use them. Whatever your reason for donating your time and energy, we appreciate your help to no end. Thank you, volunteers!
​
SKI SEASON IS AROUND THE CORNER
While work continues on our bike trails, the BETA team is already thinking ahead and working with the new Ski Trail Committee to plan ski trail work that needs to happen before the snow flies. You'll hear more from us soon about how we're preparing for the 2026 ski season; we won't be able to do it without your help.

0 Comments

Be Like Dan -- Volunteer Saturday

7/21/2026

0 Comments

 
Picture
Picture
Dan -- Thank you for clearing this blowdown at Lussi & Loggers, Lake Placid last week!

Blowdown at Lussi & Loggers, Lake Placid has been extra pesky this season. Volunteers like Dan who spend their free time clearing it a make a huge difference for the trail network and the people who like to ride there.

Be like Dan -- volunteer with us at East Branch Community Trails, Keene, NY this Saturday from 8:30am to 11:30am. We're clearing brush to make way for the newest trail in the network: Trail 8. We'll meet at the trailhead on Route 9N and then hike up to the worksite together. All tools are provided.

Register at www.bit.ly/BETAvolunteer
0 Comments

July 2026 Trail Updates: Bridges, berms, New Builds, and More

7/14/2026

0 Comments

 
BETA's trail crew, volunteers, and contractors have already tackled many trail projects this season and some of that is highlighted below.

Lake Placid
  • Trail Crew has been working hard to build a climbing trail at Craig Wood to make lapping Green or Gold Jacket that much easier.  This is a trail that we've been planning on building for years and we hope to have it open this season.  Major kudos to Trail Crew for their excellent work here.
  • Previously, the landing zone of the 50/50 drop at Craig Wood was squarely on a section of the Back Nine trail.  We have rerouted that section of Back Nine away from the landing zone to improve safety.
  • Drainage cleared, additional drainage added, and vegetation cut back on Loop 2 at Lussi & Loggers. Drainage cleared/built in order to halt the soil erosion that has washed away so much of the tread, especially on climbing sections, and made the trail more challenging than it was ever intended.

Elizabethtown
  • Joel's Trail in Blueberry Hill, Elizabethtown is a classic, beautiful mountain biking trail that honors Joel Harwood, an Elizabethtown local who put a lot of time and effort into building and maintaining trails at Blueberry Hill.  Over time, erosion has left its mark on some sections of Joel's trail -- this season, we worked there to undo the damage and restore Joel’s to its original experience.
  • Deer Leg, a new trail completed in the 2025 season, has gotten some work done to strengthen and expand berms, improve drainage, and mitigate erosion.  One volunteer work party -- sponsored by Solace Cycles and spearheaded by their shop manager Tyler -- built up the berms on Deer Leg in order to accommodate faster descent traffic.  Another volunteer work party – sponsored by Deer’s Head Inn – removed the duff layer at the entrance to Deer Leg and improved soil erosion mitigation on Pine-winder.

Wilmington
  • BETA’s Trail Crew is working at the Flume to restore trail bridges by replacing decking and, where needed, stringers and sills.  We’d like to thank the DEC for providing all building materials for the bridge restoration.  
  • Meanwhile at the Flume, BETA hired an ADK trail crew to do tread work on Marble Mountain and other trails.
  • Volunteers have filled and capped three severely eroded sections of trail on the Good Luck side of Hardy Road: one on Make Believe and two on Safe Bet; drainage cleared and added where needed on these trails. 
  • Berms on Lost Farm at Hardy Road have been rebuilt.

Saranac Lake
  • Problem wet spots at Dewey were excavated and capped with new stone and mineral soil to improve drainage, which helps to protect the trail in the long term.
  • We've received multiple contractor bids for constructing the Connector Trail from Park Ave into Natski II at Pisgah, Saranac Lake and the RFQ is now closed.  We're lucky to have many qualified, highly skilled trail builders to turn to for work like this.

Keene
  • Construction is underway on the latest trail at East Branch Community Trails.  This new trail, currently called Trail 8, is located farther up the mountain from Trail 7.  Psst -- soon we're going to ask for community input on what to name Trail 7 and Trail 8, so start thinking up some good ones and keep your eyes peeled for the call for submissions.
  • Executive Director Glenn and Keene Town Supervisor Joe Pete have met to discuss restoration of the trailhead pavilion and expansion of the parking lot, projects we expect to break ground on in 2027.
0 Comments

1000 Animals Recap -- What a Zoo!

7/9/2026

0 Comments

 
Wow, what a ride! Thank you so much to everyone who came out for 1000 Animals Social Athletic Club Group Ride last week, it was such a great time seeing everyone and sharing the trails. We don’t host many big group rides like this one so 1000 Animals is extra special to us. It’s always such a treat to see the trails taken over by costume-clad compatriots, whooping and hollering, smiling ear to ear. Not to mention, the BBQ was a great way to finish the evening.

Special cheers to the two folks whose very first mountain biking excursion was 1000 Animals – honored to be part of your mountain biking journey. Glad you both had a stellar time, looking forward to seeing you on the trails again.

A great big thank you to our ride leaders: Patrick, Tat, and everyone who volunteered to assist for leading us through the woods; to our event sponsors Placid Planet Bicycles and West Shore BBQ for giving us a great place to start/stop; and to each and every person who came out for the evening. Until next time – see you on the trails!
Picture
Picture
Picture
0 Comments

Annual Meeting & 40th Anniversary Recap

5/13/2026

0 Comments

 
In early May, we hosted our Annual Meeting and celebrated our 40th anniversary. It was amazing to see so many friendly faces and reflect on 40 years of work by the Adirondack Ski Touring Council and the Barkeater Trails Alliance.

We were honored to be awarded a citation from Assemblyman Cashman recognizing BETA's impact and role within the community. Cashman spoke briefly about the importance of recreational trails as vital infrastructure and the majesty of the Adirondacks and the people who call it home.

Thank you so much to all the folks who came out to celebrate with us -- it was great to see you. Cheers to another 40 years!
Picture
Picture
0 Comments

Trail Towns; Our Towns

12/18/2025

0 Comments

 
Where does your mind go when you hear the phrase “trail town”?  

Places like Bentonville, Asheville, Park City and Jackson are often cited as big trail towns across the country.  We think great trail towns are much closer.  They’re the towns we call home, right here in the Adirondacks.
Picture
Picture
Think about what makes them special.

To us, it’s clear—the people make our towns what they are. It’s the shared passion for finding peace, challenge, and friendship on the trails that meander through each town. It’s the dedication to steward these trails with our time and labor. And it’s the support we show one another in times of need and celebration.  

These elements weave together to create a network of committed people supporting the wild places that brought many of us here in the first place.  Organizations like the Barkeater Trails Alliance are a reflection of the people who make trail towns special, and of our collective commitment to trails that get us outside and together as a community.  
Picture
Picture
As we enter our 40th year of advocating for, building, and stewarding trails that connect us, we encourage you to consider making a year-end donation to support this work.  

Join the 135+ people who have already given this season.  Help us build trails and create community in 2026.

You may have seen the incredible news: together, our community met our goal of raising $20,000 in community donations to unlock the full $20,000 matching donation from a generous anonymous donor.  That’s a powerful reminder of what this community can do together!

Thank you to everyone who has already contributed.  If you were hoping to make a donation this year, you can still be a part of this moment.  Every donation supports our work to build and care for trails and strengthen the community. 
Picture
0 Comments

The Jackrabbit Trail -- Epic & Timeless

11/24/2025

0 Comments

 
As part of our End-of-Year Campaign, we’re sharing stories that capture what makes this community — and these trails — so special. Today, we’re excited to share a story of a trail many of us know by heart: the Jackrabbit Trail.
“We got as far as a cellar hole…and now BETA has built a veritable mansion of trails on that foundation.”

That’s what Tony Goodwin — one of the founders of the Adirondack Ski Touring Council (BETA’s founding organization) — said recently, drawing special attention to  recent improvements to the Jackrabbit. When he first envisioned the trail nearly four decades ago, it was a humble idea held together by volunteers, hand tools, and a deep love of skiing.
​
But what Tony is most proud of is not what he built — it’s what you and this community have continued to build.
Picture
Tony Goodwin scouting the Mountain Lane reroute. Photo taken by Josh Wilson in the summer of 2020.
Picture
​In the last year, because of Jackrabbit supporters like you, BETA created:
​
  • A new bypass on Mountain Lane, giving skiers a safer, more wooded experience
  • A fresh reroute at Scott’s Cobble, which Josh Wilson called “the biggest improvement to the Jackrabbit in at least a decade”
  • A brand-new parking area and 64-foot bridge (pictured, right) at the Keene end near Rock and River, opening access while giving the landowners a well-earned reprieve

​These projects weren’t just trail work — they were community work.

“What a great feeling — to build something we’ll all get to share.”
Picture
That’s what Brooks Reynolds (below, second from the right) said about a volunteer work party sponsored by the Reynolds Group of Lake Placid.  As a family of avid mountain bikers and skiers, the Reynolds use BETA trails often and they’re sure to visit the Jackrabbit this season.
Picture
People of all ages came out. They cleared brush, carried lumber, shared food in the chilly fall sun, and left knowing they had built something lasting.

Moments like this are why the Jackrabbit matters.  It isn’t just a trail. It’s generations of people — founders, landowners, builders, volunteers, skiers, kids, elders — choosing to care for something bigger than themselves.
​
And now we are asking you to help carry that legacy into the future.

A generous donor is matching every community gift made through December 31st — up to $20,000 — to celebrate BETA’s 40th year. That means: Your $50 becomes $100. Your $100 becomes $200. Your gift builds the next decade of Jackrabbit stories.
Picture
With winter around the corner, we hope you get out on the Jackrabbit — whether for a quiet out-and-back or the whole 40-mile epic. And maybe, just maybe, we’ll see you out there… following in the tracks of legends like Jackrabbit Johannsen.  As Jackrabbit himself famously said, “Ski, ski, ski!”

Thank you for being part of this community.
And thank you for helping write the next chapter.
Picture
0 Comments

Volunteer Efforts of 2025

11/6/2025

0 Comments

 
PROJECTS
As part of our stewardship initiative, we hosted 11 volunteer trail work days across the region. 

​Some of our biggest volunteer efforts were those working on the…
  • New trail, Deerleg, at Blueberry Hill, Elizabethtown
  • Back Nine reroute at Craig Wood, Lake Placid
  • Restoration at Hardy Road, Wilmington
  • Mountain Lane reroute of the Jackrabbit Trail, Lake Placid
  • Maintaining popular trails at Dewey Mountain, Saranac Lake
  • Construction of the Skills Loop at East Branch Community Trails, Keene 
Picture
Picture
Picture
Group photo from the youth work day at Mount Pisgah, Saranac Lake
Picture
Group photo from a work party at Blueberry Hill, Elizabethtown that tackled portions of Deerleg
THANK YOU, VOLUNTEERS!
In addition to the baseline satisfaction of volunteer work days, this year we’ve had the special pleasure of welcoming a lot of new faces into the volunteer ranks.  We’ve seen a big increase in logged volunteer hours over previous years, too.  Thank you so much to each and every one of you for donating your time and energy to the trails; your hard work is much appreciated by us at BETA and surely by every rider, skier, hiker, or runner who enjoys the trails. 

​If you’ve supported BETA’s work by volunteering in any way this season, please log your hours here: bit.yl/LogHours4BETA.  Doing so helps us track volunteer efforts and apply for more grant funding for trails (DYK: volunteer labor is valued at $38+ per hour!)
Log My Volunteer Hours
THANK YOU, SPONSORS!
In addition to volunteers, we’d like to thank the businesses who sponsored work parties this season: Silver Birch Cycles, Bike ADK, The Reynolds Group, Placid Planet Bicycles, and Origin Coffee.  If you’re business is interested in sponsoring a work party next year, please contact [email protected]
Picture
Picture
Picture
Picture
Picture
THANK YOU, CHRIS!
Finally, we’d like to thank Chris Gosling for his service as our Volunteer Stewardship Coordinator over the summer.  Your efforts to connect volunteers with trail work opportunities and provide fun and rewarding experiences for everyone was greatly appreciated.  We’re sure to see you on the trail sometime soon!
Picture
Chris, center, giving an orientation at the beginning f a work party at Dewey, Saranac Lake. PC: Karen Miemis
0 Comments
<<Previous
    UPCOMING EVENTS

    Categories

    All
    Behind The Scenes
    Biking
    Blueberry Hill
    Cobble Hill
    Craig Wood
    Dewey
    East Branch
    Elizabethtown
    Events
    Flume Trails
    Fowler's Crossing
    Funding
    Hardy Road
    Jackrabbit Ski Trail
    Jay
    Keene
    Lake Placid
    Lussi/Loggers
    Mt. Pisgah
    Odds & Ends
    Saranac Lake
    Ski
    Staff
    Three Sisters Preserve
    Trail Conditions
    Trail Work
    Volunteering
    Wilmington
    Youth

    Archives

    September 2026
    August 2026
    July 2026
    June 2026
    May 2026
    April 2026
    March 2026
    February 2026
    January 2026
    December 2025
    November 2025
    July 2025
    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    June 2024
    May 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    June 2023
    March 2023
    February 2023
    January 2023
    November 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022

    RSS Feed

    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture

Picture

BARKEATER TRAILS ALLIANCE (BETA)
volunteer driven - member supported - human powered

Address

P.O. Box 843 - ​Lake Placid, NY 12946

Telephone

518.523.1365

Email

[email protected]
Privacy Policy
  • HOME
  • ABOUT
    • Who We Are
    • History
    • Annual Reports
    • Board of Directors
    • Staff
    • Community Partners
    • Blog
    • Newsletter Sign Up
    • Contact Us
  • DONATE
    • Give Today
    • Legacy Giving
  • BIKE TRAILS
    • Bike Trail Conditions
    • Ride With Gratitude
    • Wilmington >
      • Flume Trails
      • Hardy Road (Beaver Brook)
      • Three Sisters (Quaker Mountain)
    • Lake Placid >
      • Lussi Trails
      • Loggers Loops
      • Craig Wood Trails
    • Saranac Lake >
      • Dewey Mountain
      • Mount Pisgah
      • Fowler's Crossing
    • Elizabethtown >
      • Otis Mountain
      • Blueberry Hill
    • Keene
  • SKI TRAILS
    • Conditions
    • Jackrabbit Ski Trail >
      • Lake Clear JCT to Pauls Smith's VIC
      • Saranac Lake to McKenzie Pond Road
      • McKenzie Pond Road to Whiteface Inn
      • Whiteface Inn to Mirror Lake
      • Mirror Lake to ADK Cascade Trails
      • ADK Cascade Trails to Keene
  • EVENTS
    • Hardy Kids MTB Race 08/29
    • Pedal & Potluck 08/29
    • Best Day Ever Film Screening 09/18
    • Community Bike Jam 10/02
  • VOLUNTEER
  • MERCH
Live Chat Support ×

Connecting

You: ::content::
::agent_name:: ::content::
::content::
::content::