BARKEATER TRAILS ALLIANCE
  • HOME
  • ABOUT
    • Who We Are
    • History
    • Annual Reports
    • Board of Directors
    • Staff
    • Community Partners
    • Blog
    • Newsletter Sign Up
    • Contact Us
  • DONATE
    • Give Today
    • Legacy Giving
  • BIKE TRAILS
    • Bike Trail Conditions
    • Ride With Gratitude
    • Wilmington >
      • Flume Trails
      • Hardy Road (Beaver Brook)
      • Three Sisters (Quaker Mountain)
    • Lake Placid >
      • Lussi Trails
      • Loggers Loops
      • Craig Wood Trails
    • Saranac Lake >
      • Dewey Mountain
      • Mount Pisgah
      • Fowler's Crossing
    • Elizabethtown >
      • Otis Mountain
      • Blueberry Hill
    • Keene
  • SKI TRAILS
    • Conditions
    • Jackrabbit Ski Trail >
      • Lake Clear JCT to Pauls Smith's VIC
      • Saranac Lake to McKenzie Pond Road
      • McKenzie Pond Road to Whiteface Inn
      • Whiteface Inn to Mirror Lake
      • Mirror Lake to ADK Cascade Trails
      • ADK Cascade Trails to Keene
  • EVENTS
    • Hardy Kids MTB Race 08/29
    • Pedal & Potluck 08/29
    • Best Day Ever Film Screening 09/18
    • Community Bike Jam 10/02
  • VOLUNTEER
  • MERCH

August 29th Schedule -- Hardy Kids, Pedal & Potluck

8/28/2026

0 Comments

 
This Saturday is LOADED with BETA events!  The Hardy Kids MTB Race and Pedal & Potluck pop-up event are both happening on August 29th in Wilmington.  See you there!
Picture
HARDY KIDS MTB RACE
REGISTRATION CLOSES 6PM FRIDAY: www.bit.ly/HardyKids

Started by kids, for kids; now proudly hosted by BETA. Riders from pre-K to high school are invited to participate in this fun ride & race. Stick around after the race for a trailhead BBQ.

Check-in 8:00am to 8:45am; races start at 9:00am. Grilling to kick off around 9:30am -- stick around for a hot dog and to meet other families🌭

Thank you so much to the riders, volunteers, and sponsors (below) who make this event possible!  
Picture
PEDAL & POTLUCK
Meet you at the Wilmington Town Park for a Wilmington MTB-themed scavenger hunt, group rides, and a community potluck.

👀 SCAVENGER HUNT 
Stop by the park anytime after 7:30am to pick up a Wilmington MTB-themed scavenger hunt list of side quests and do your best to collect them all with a selfie. Go solo or bring your crew, whatever floats your boat. Turn in your completed scavenger hunt list right back at the park during the potluck, between 4:00pm and 7:00pm.

🚵 GROUP RIDES
 Not so into the scavenger hunt, but want to ride in good company? Join a group ride. Sign up sheets will be posted at the park beforehand.
🚵 The advanced group ride led by Patrick Carey and Eli Land will meet at the park at 10:00am, wheels rolling by 10:15am. That ride will be 20-25 miles and include a tour of the Flume and Cooper Kiln, pit stop at the park, and then down to Hardy Road.
🚵The intermediate group ride led by Dan Cash will meet at 1:45pm at the park, wheels rolling by 2:00pm.

🌭 POTLUCK
​
From 4:00pm to 7:00pm, we're sharing a meal at the park. BYOP, BYOB, BYOC -- bring your own plate, beverage, and chair. Please bring something to share with the group -- thank you!

PEDAL & POTLUCK SCHEDULE:
⭐7:30am -- Scavenger hunt opens; stop by the Wilmington Recreation Park to pick up the scavenger hunt list of quests.
⭐10:00am -- Advanced group ride meets at the park at 10:00am, wheels rolling by 10:15am.
⭐12:00pm -- Kaley (board Secretary) and Bryan (board Co-Chair) will be at the park to man the scavenger hunt and group ride sign up. If you have questions, stop by to see them.
⭐1:45pm -- Intermediate group ride meets at the park at 1:45pm, wheels rolling by 2:00pm.
⭐4:00pm -- Potluck begins. Bring something to share, your beverage of choice, and a lawn chair. Bathrooms will be open. If you did the scavenger hunt, turn in your sheet at the sign up station to collect your kudos, bragging rights, and maybe even a little prize.
⭐7:00pm -- Potluck wraps up. Thanks for coming!
Picture
0 Comments

Hardy Kids MTB Race August 29th

7/31/2026

0 Comments

 
HARDY KIDS MTB RACE | AUGUST 29th | HARDY ROAD, WILMINGTON, NY

Don't miss this mountain bike fun ride and race for kids in pre-K through high school! Come for the race, stay for the BBQ and socialize.

​This awesome event was started 8 years ago by kids, for kids; BETA is proud to host it for the first time this year.
REGISTER NOW
Picture
Picture
0 Comments

July 2026 Trail Updates: Bridges, berms, New Builds, and More

7/14/2026

0 Comments

 
BETA's trail crew, volunteers, and contractors have already tackled many trail projects this season and some of that is highlighted below.

Lake Placid
  • Trail Crew has been working hard to build a climbing trail at Craig Wood to make lapping Green or Gold Jacket that much easier.  This is a trail that we've been planning on building for years and we hope to have it open this season.  Major kudos to Trail Crew for their excellent work here.
  • Previously, the landing zone of the 50/50 drop at Craig Wood was squarely on a section of the Back Nine trail.  We have rerouted that section of Back Nine away from the landing zone to improve safety.
  • Drainage cleared, additional drainage added, and vegetation cut back on Loop 2 at Lussi & Loggers. Drainage cleared/built in order to halt the soil erosion that has washed away so much of the tread, especially on climbing sections, and made the trail more challenging than it was ever intended.

Elizabethtown
  • Joel's Trail in Blueberry Hill, Elizabethtown is a classic, beautiful mountain biking trail that honors Joel Harwood, an Elizabethtown local who put a lot of time and effort into building and maintaining trails at Blueberry Hill.  Over time, erosion has left its mark on some sections of Joel's trail -- this season, we worked there to undo the damage and restore Joel’s to its original experience.
  • Deer Leg, a new trail completed in the 2025 season, has gotten some work done to strengthen and expand berms, improve drainage, and mitigate erosion.  One volunteer work party -- sponsored by Solace Cycles and spearheaded by their shop manager Tyler -- built up the berms on Deer Leg in order to accommodate faster descent traffic.  Another volunteer work party – sponsored by Deer’s Head Inn – removed the duff layer at the entrance to Deer Leg and improved soil erosion mitigation on Pine-winder.

Wilmington
  • BETA’s Trail Crew is working at the Flume to restore trail bridges by replacing decking and, where needed, stringers and sills.  We’d like to thank the DEC for providing all building materials for the bridge restoration.  
  • Meanwhile at the Flume, BETA hired an ADK trail crew to do tread work on Marble Mountain and other trails.
  • Volunteers have filled and capped three severely eroded sections of trail on the Good Luck side of Hardy Road: one on Make Believe and two on Safe Bet; drainage cleared and added where needed on these trails. 
  • Berms on Lost Farm at Hardy Road have been rebuilt.

Saranac Lake
  • Problem wet spots at Dewey were excavated and capped with new stone and mineral soil to improve drainage, which helps to protect the trail in the long term.
  • We've received multiple contractor bids for constructing the Connector Trail from Park Ave into Natski II at Pisgah, Saranac Lake and the RFQ is now closed.  We're lucky to have many qualified, highly skilled trail builders to turn to for work like this.

Keene
  • Construction is underway on the latest trail at East Branch Community Trails.  This new trail, currently called Trail 8, is located farther up the mountain from Trail 7.  Psst -- soon we're going to ask for community input on what to name Trail 7 and Trail 8, so start thinking up some good ones and keep your eyes peeled for the call for submissions.
  • Executive Director Glenn and Keene Town Supervisor Joe Pete have met to discuss restoration of the trailhead pavilion and expansion of the parking lot, projects we expect to break ground on in 2027.
0 Comments

Volunteer Work Party -- Hardy Round 2

7/10/2026

0 Comments

 
Keep reading for BEFORE (the rain) and AFTER (the rain).

Thanks so much to the folks who came out to Hardy Road, Wilmington on July 9th to give the trails some TLC.  This was the second work party this season held at Hardy (the last one focused on berms on Lost Farm).

Our crew split into two groups, both tackling erosion in different areas on the Good Luck side of Hardy. It was a truly excellent volunteer session – we stayed safe, had fun, and also got some good work done. Bing-bing-bing, checked off everything on the list.


Unfortunately, we did get a smidge of rain. We were just wrapping up the filling in of an eroded trail section when it started to sprinkle. Hardly anything, barely reached us down on the forest floor. We kind of wanted it to reach us – it was hot, we were dirty, a little rain would probably feel refreshing. Well. To say our wants were heard and obliged is an understatement.

The sky opened up as we hiked out of the trail network. Pouring rain, nonstop big fat raindrops. No use in hurrying – there was no outrunning this deluge. Everyone was soaked to the bone by the time we returned to the parking lot. A silver lining: we were already as wet as we were going to get, so we might as well hang out in the parking lot and enjoy each other's company.

It was great working with everyone. Thanks again for spending your evening working alongside us on the trail.

If you'd like to join us for the next work party, look for upcoming dates on our Volunteer webpage and sign up here.
0 Comments

Volunteer Efforts of 2025

11/6/2025

0 Comments

 
PROJECTS
As part of our stewardship initiative, we hosted 11 volunteer trail work days across the region. 

​Some of our biggest volunteer efforts were those working on the…
  • New trail, Deerleg, at Blueberry Hill, Elizabethtown
  • Back Nine reroute at Craig Wood, Lake Placid
  • Restoration at Hardy Road, Wilmington
  • Mountain Lane reroute of the Jackrabbit Trail, Lake Placid
  • Maintaining popular trails at Dewey Mountain, Saranac Lake
  • Construction of the Skills Loop at East Branch Community Trails, Keene 
Picture
Picture
Picture
Group photo from the youth work day at Mount Pisgah, Saranac Lake
Picture
Group photo from a work party at Blueberry Hill, Elizabethtown that tackled portions of Deerleg
THANK YOU, VOLUNTEERS!
In addition to the baseline satisfaction of volunteer work days, this year we’ve had the special pleasure of welcoming a lot of new faces into the volunteer ranks.  We’ve seen a big increase in logged volunteer hours over previous years, too.  Thank you so much to each and every one of you for donating your time and energy to the trails; your hard work is much appreciated by us at BETA and surely by every rider, skier, hiker, or runner who enjoys the trails. 

​If you’ve supported BETA’s work by volunteering in any way this season, please log your hours here: bit.yl/LogHours4BETA.  Doing so helps us track volunteer efforts and apply for more grant funding for trails (DYK: volunteer labor is valued at $38+ per hour!)
Log My Volunteer Hours
THANK YOU, SPONSORS!
In addition to volunteers, we’d like to thank the businesses who sponsored work parties this season: Silver Birch Cycles, Bike ADK, The Reynolds Group, Placid Planet Bicycles, and Origin Coffee.  If you’re business is interested in sponsoring a work party next year, please contact [email protected]
Picture
Picture
Picture
Picture
Picture
THANK YOU, CHRIS!
Finally, we’d like to thank Chris Gosling for his service as our Volunteer Stewardship Coordinator over the summer.  Your efforts to connect volunteers with trail work opportunities and provide fun and rewarding experiences for everyone was greatly appreciated.  We’re sure to see you on the trail sometime soon!
Picture
Chris, center, giving an orientation at the beginning f a work party at Dewey, Saranac Lake. PC: Karen Miemis
0 Comments

​Trail Updates, Nov. 2025: New trails at East Branch, Rock & River Jackrabbit Trailhead Complete

11/5/2025

0 Comments

 
Our last trail work update was in late July.  Major developments since then include:
  • Elizabethtown: new trail (Deerleg) completed and open at Blueberry Hill.
  • Keene: Two new upper mountain trails (Trail 7 Climb & Trail 7 Descent) completed and open at East Branch Community Trails.  Funding sought for the final phase of construction.
  • Jay: Planning underway for potential new trails in the Four Peaks Wilderness.
  • Saranac Lake: Construction of connector trail from Park Ave to Mount Pisgah delayed until 2026. Funding sought for implementing Mount Pisgah Summer Trails Enhancement Plan.
  • Wilmington: Talks with landowners and Adirondack Land Trust underway to secure agreement for connector trail from Three Sisters to Hardy Road.
  • Jackrabbit Trail: Mountain Lane reroute finished and open. Eastern terminus trailhead, bridges, parking lot, and trail section under construction; expected completion by December 2025.
Read on for more information about the above updates as well as an overview of all the work done in the 2025 trail work season.

Elizabethtown

BLUEBERRY HILL
Deerleg, a mostly machine-built trail that connects Bronson fire pit trailhead to the rock quarry with a pleasantly meandering route (no fall line climbs on this one!), is completely finished and open for riding.  This summer we hosted two volunteer work parties at Deerleg -- one focused on snipping back troublesome roots and the other focused on finishing the end of the trail by digging to durable mineral soil.  We’ve gotten a lot of positive feedback on this new trail; to those who haven’t ridden at Blueberry before, this is the perfect excuse to check it out.  
​
COBBLE HILL
New signage has been installed throughout.  Gear up before or chill out after your ride at the E’town Trail Center at the base of Cobble Hill – you will not be disappointed.

Keene/Jay

EAST BRANCH COMMUNITY TRAILS
  • Four new trails opened in the 2025 season: Boulder Rush and Duzzi in early June; trails known for now as Trail 7 Climb and Trail 7 Descent in late October.  To access Trail 7 Climb, proceed clockwise around Sentinel Loop.  Signage for Trail 7 Climb will be on your left.
  • The Skills Loop path around the trailhead field was built; skill features are coming soon.
  • We are pursuing funding for final work which will include more trails, expanded parking, and a set of jump lines.
JAY
  • We are working with the Town of Jay to make plans related to recreation opportunities.  One area of great interest is the potential for future trails within the Four Peaks Tract which was acquired by the NYS DEC in July of 2024. The Four Peaks Tract has potential to connect to Hardy Road/Beaver Brook trails.
Picture

Lake PLacid

CRAIG WOOD
  • Improvements that began in 2024 have continued.  This season, we tackled a machine built reroute of the climbing section of Back Nine to improve the riding experience and long term sustainability of this climbing section.  This was quite the undertaking, but if you’ve ridden the new trail we think you’ll agree – it was worth it.
  • We teamed up with the Lake Placid Outing Club to host a youth-focused volunteer session at Craig Wood.  We worked on removing problem stones and roots as well as clearing drainages.

Saranac Lake

MOUNT PISGAH
  • With support from the Village of Saranac Lake and the Town of St. Armand, we contracted Peduzzi Trail Building to develop the Mount Pisgah Summer Trails Enhancement Plan.  This plan has helped us identify key needs at the mountain, such as trail reroutes to improve the riding experience and trail sustainability, new green trails on the lower slopes to expand the range of experiences available to Mount Pisgah, and more.  We are currently working with the Town of St. Armand to apply for a Smart Growth Grant to fund these projects.  Funding-dependent, construction on some projects could begin in 2026.
  • The connector trail from Park Ave into Mount Pisgah was delayed this season because of conflict between the original route and future plans by the developer, but we’ve since created a new trail alignment that accommodates their plans for development.  Trail construction is expected to begin in 2026.
  • We teamed up with the Saranac Lake Innovative Cycling Kids group to host a youth-focused volunteer session at Mount Pisgah.  We cleared blowdown, trimmed roots, and lopped back branches in the corridor.​
DEWEY
  • In partnership with a few local business sponsors, we hosted numerous volunteer work parties to address specific wet sections, pop rocks, and remove troublesome roots. 

Wilmington

THREE SISTERS PRESERVE
  • Flobus – Rebuild of some sections of lower Flobus to improve the riding experience was completed in early summer.
  • Town Connector – New route flagged and approved from Outlook Lane to Three Sisters with construction planned for 2026.  This reroute will preserve access between the Wilmington Town Recreation Park, Three Sisters, and by extension Hardy Road even as the Outlook Lane neighborhood continues development.  Thank you to the landowner for his support of our effort to maintain access!
HARDY ROAD
  • Procrew and volunteers worked together to make significant improvements to the lower section of All In, including restoration that addressed some of the more extensive wear due to use and erosion. 
  • We are working with land owners and the Adirondack Land Trust to find potential new connections between Three Sisters and Hardy Road.  Our long term goal is to create a trail that will keep you in the woods and off the road when biking between Hardy Road and Three Sisters.  We’re excited to work with the landowners involved in this agreement and are grateful for their early support.
Picture
Picture
Picture

Ski Trails

  • Between Lake Placid and Keene: Reroute of 0.5 miles of the Jackrabbit Trail (JRT) off of Mountain Lane and onto state land has been completed.  This reroute removes the worst part of walking/skiing on Mountain Lane.  This project was completed ahead of schedule thanks to procrew’s efficient use of the chainsaw window and a tenacious volunteer work party held in mid-September.  Thank you for your hard work! 
  • Eastern JRT terminus: Construction of new trailhead parking lot, three bridges (one with a 64' span which was featured recently on our social media), and a section of new trail at the eastern end of JRT near Rock & River is underway.  We expect to finish in time for this ski season.​

System-Wide Projects

  • SIGNAGE: Getting lost in the woods is no fun.  We’re posting more informative and consistent signage across the region to help with navigation and safety.
  • RESTORATION: We’ve focused on maintenance and restoration in locations where erosion or use has reduced the quality of the trail.  It’s our pleasure to care for the trails that are our responsibility.
  • PLANNING: The most exhilarating kind of trail work!  Quality new trails come from quality planning.  We’re collaborating on and crafting master trail use plans in areas where it’s needed in order to creatively and sustainably enhance the riding experience.​

More to Come

BETA’s work is multi-facetted, ever-evolving, and always dedicated to maintaining and building trails and creating community.  The end of the 2025 trail work season is rapidly approaching, but we're still busy planning for next year's projects.

If the 2025 trail projects have benefitted you or your community, please consider supporting our work by becoming a member or renewing your membership at a higher giving level.  We are so deeply grateful to the hundreds of people who build, fund, champion, and enjoy these trails -- you're both the reason and the way that we do what we do: build trails and create community.  Thank you!
Picture
0 Comments

Trail Work Updates: Our Plans Include...

7/31/2025

0 Comments

 
There is always something cooking at BETA.  Right now, some of the projects on our horizon include the following.

​ELIZABETHTOWN
  • Blueberry Hill: The machine built section of the new climbing trail is complete.  Dusty and Scott are continuing with the handwork to finish the trail in the next couple of weeks. This volunteer- and pro-crew-built trail offers an easier alternative to Hemlock for climbing and returning to the trailhead off of Bronson Way. 
  • Cobble Hill: We’ll have new signage installed here soon.  Great timing since we’ll be riding there on August 12th for our next Slow Your Roll Ride!
 
KEENE
  • East Branch Community Trails, on top of the two new trails already opened this season, we have:
    • Peduzzi Trail Building has begun construction of a climbing trail and descent trail above the power lines.  That’s right, we’re starting on a whole new section of ground for these trails and adding more elevation!  If all goes according to plan, the new trail will be open before October, just in time for the UCI World Cup.
    • The Skills Loop is currently rideable and we are working with Peduzzi and local volunteers to plan and build technical trail features to help riders advance their skills in a controlled environment. 
  • Jackrabbit Trail: The Rock and River trailhead to access the JRT is moving forward.  Construction is done on the parking lot and work on the trail and bridges will be happening over the next few months.  Stay tuned for volunteer work parties there this fall. 
 
LAKE PLACID
  • Craig Wood/Scott’s Cobble: 
    • As we mentioned in our last update, Dusty, Scott, and an amazing brigade of volunteers finished the climbing reroutes on Back Nine.  It has really improved the riding experience in that section and simultaneously made the trail much more sustainable against heavy rains and erosion.
    • On August 17th, the Lake Placid Outing Club (LPOC) and BETA are teaming up to bring kids in LPOC and their families out for a volunteer trail work party at Craig Wood, Lake Placid.  Not only is it fun, volunteering is also a great way to cultivate a sense of stewardship, respect, and gratitude for the amazing trails we have at our fingertips.  This work party is only open to members of LPOC and their families.  Register here.
  • Jackrabbit Trail: 
    • If time permits, we’ll replace the stringers on the bridge at the bottom of the JRT near River Road this fall.  We have temporarily patched the one at risk of failure to get us through the upcoming winter if we don’t get to the replacement this season.
    • ​A reroute of the JRT to that will take us off of part of Mountain Lane is approved and will be constructed in late fall during the chainsaw window.  This is a sizable undertaking and we hope to host a few volunteer trail work parties to tackle some aspects of this project.  Stay tuned for more details as summer draws to a close.

SARANAC LAKE
  • Mt. Pisgah: 
    • We’re working with the folks at Cure Cottage Development LLC in order to create a new access trail route from Park Ave to Mt. Pisgah that accommodates their plans for development of Trudeau Village, a major project to renovate the former Adirondack Cottage Sanitarium and create affordable housing in Saranac Lake.
    • On Monday, July 28th, the Saranac Lake Village Board voted unanimously to approve and sponsor BETA’s Mt. Pisgah Summer Trails Enhancements and Master Plan.  We will keep you posted on what that means for Mt. Pisgah – look forward to more information in our next newsletter and as we try to secure funding for the work.
    • A volunteer trail work party with the Saranac Lake Innovative Cycles Kids (SLICK) will be held at Mt. Pisgah on Sunday, August 17th.  Kids and their families, regardless of their involvement with SLICK, are encouraged to join in on this fun and gratifying activity.  Register here.
  • Dewey: We hosted a volunteer trail work party at Dewey on July 24th sponsored by Silver Birch Cycles and have another one on the calendar for August 25th sponsored by Bike Adirondacks.  These evening work parties focus on brushing, root removal, clearing drainages, and treadwork in a few sections.  Register for the next work day here.

WILMINGTON
  • Three Sisters: A new route for the Town Connector has been flagged and approved from Outlook Lane to Three Sisters with construction planned for 2026.  This reroute will help preserve recreational access between the Wilmington Recreation Town Park and Hardy Road even as development proceeds on private property in the area. We are thankful to the landowner for his support of our effort to maintain access!
  • Hardy Road: Right now Dusty and Scott are putting the finishing touches on a bit more work on All In for the season.  Meanwhile, we are finalizing the trail conditions assessment in order to produce a recommendation of Hardy Rd trail work for DEC review and approval for 2026.  That’s right, we’re already looking ahead to 2026 so we can hit the ground running next trail season.
0 Comments
    UPCOMING EVENTS

    Categories

    All
    Behind The Scenes
    Biking
    Blueberry Hill
    Cobble Hill
    Craig Wood
    Dewey
    East Branch
    Elizabethtown
    Events
    Flume Trails
    Fowler's Crossing
    Funding
    Hardy Road
    Jackrabbit Ski Trail
    Jay
    Keene
    Lake Placid
    Lussi/Loggers
    Mt. Pisgah
    Odds & Ends
    Saranac Lake
    Ski
    Staff
    Three Sisters Preserve
    Trail Conditions
    Trail Work
    Volunteering
    Wilmington
    Youth

    Archives

    September 2026
    August 2026
    July 2026
    June 2026
    May 2026
    April 2026
    March 2026
    February 2026
    January 2026
    December 2025
    November 2025
    July 2025
    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    June 2024
    May 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    June 2023
    March 2023
    February 2023
    January 2023
    November 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022

    RSS Feed

    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture

Picture

BARKEATER TRAILS ALLIANCE (BETA)
volunteer driven - member supported - human powered

Address

P.O. Box 843 - ​Lake Placid, NY 12946

Telephone

518.523.1365

Email

[email protected]
Privacy Policy
  • HOME
  • ABOUT
    • Who We Are
    • History
    • Annual Reports
    • Board of Directors
    • Staff
    • Community Partners
    • Blog
    • Newsletter Sign Up
    • Contact Us
  • DONATE
    • Give Today
    • Legacy Giving
  • BIKE TRAILS
    • Bike Trail Conditions
    • Ride With Gratitude
    • Wilmington >
      • Flume Trails
      • Hardy Road (Beaver Brook)
      • Three Sisters (Quaker Mountain)
    • Lake Placid >
      • Lussi Trails
      • Loggers Loops
      • Craig Wood Trails
    • Saranac Lake >
      • Dewey Mountain
      • Mount Pisgah
      • Fowler's Crossing
    • Elizabethtown >
      • Otis Mountain
      • Blueberry Hill
    • Keene
  • SKI TRAILS
    • Conditions
    • Jackrabbit Ski Trail >
      • Lake Clear JCT to Pauls Smith's VIC
      • Saranac Lake to McKenzie Pond Road
      • McKenzie Pond Road to Whiteface Inn
      • Whiteface Inn to Mirror Lake
      • Mirror Lake to ADK Cascade Trails
      • ADK Cascade Trails to Keene
  • EVENTS
    • Hardy Kids MTB Race 08/29
    • Pedal & Potluck 08/29
    • Best Day Ever Film Screening 09/18
    • Community Bike Jam 10/02
  • VOLUNTEER
  • MERCH
Live Chat Support ×

Connecting

You: ::content::
::agent_name:: ::content::
::content::
::content::