BARKEATER TRAILS ALLIANCE
  • HOME
  • ABOUT
    • Who We Are
    • History
    • Annual Reports
    • Board of Directors
    • Staff
    • Careers
    • Community Partners
    • Blog
    • Newsletter Sign Up
    • Contact Us
  • DONATE
    • Give Today
    • Legacy Giving
  • BIKE TRAILS
    • Bike Trail Conditions
    • Ride With Gratitude
    • Wilmington >
      • Flume Trails
      • Hardy Road (Beaver Brook)
      • Three Sisters (Quaker Mountain)
    • Lake Placid >
      • Lussi Trails
      • Loggers Loops
      • Craig Wood Trails
    • Saranac Lake >
      • Dewey Mountain
      • Mount Pisgah
      • Fowler's Crossing
    • Elizabethtown >
      • Otis Mountain
      • Blueberry Hill
    • Keene
  • SKI TRAILS
    • Conditions
    • Jackrabbit Ski Trail >
      • Lake Clear JCT to Pauls Smith's VIC
      • Saranac Lake to McKenzie Pond Road
      • McKenzie Pond Road to Whiteface Inn
      • Whiteface Inn to Mirror Lake
      • Mirror Lake to ADK Cascade Trails
      • ADK Cascade Trails to Keene
  • EVENTS
  • VOLUNTEER
  • MERCH

September 2026 Trail Work Round Up: New Trails Open; Ski Maintenance underway

9/21/2026

0 Comments

 
Volunteers, contractors, and the BETA trail crew have been checking trail projects off the list left and right. Here are some highlights:​

Jackrabbit Ski Trail | Paul Smiths, Lake Placid, Keene
  • Replacement of the Bird Song Bridge in Lake Placid (below).
  • Side cutting from Paul Smith’s VIC to Haul Road, Bird Song Lane to Craig Wood, Craig Wood to Route 86.
  • Additional signage from Paul Smith’s VIC to Haul Road for easier wayfinding.
  • New ramp and railing extensions at Bob’s Bridge near the Keene trailhead to make a safer entrance for skiers (below).
  • Upcoming Jackrabbit Trail Work Projects
    • Railing replacement on Theresa's Bridge in Lake Placid.
    • Seasonal mowing with Tony Goodwin and Woods McCahill.
    • Volunteer day to clean drainage on McKenzie Pass from Whiteface Inn Lane, Lake Placid on October 25th.
  • Upcoming Trail Work Projects on Other Ski Trails
    • Side cutting at the Hays Brook trail in Paul Smiths. 
    • Blowdown removal and clearing in the High Peaks Wilderness 
Picture
Bird Song Bridge -- Early in the replacement process; crossbeam removal.
Picture
Bird Song Bridge -- After replacement. New stringers, sills, abutments, and decking.
Picture
Bob's Bridge near the Keene trailhead. Bridge and railing extension on the left.
Dewey | Saranac Lake
  • Side cutting on Backgammon.
  • Replaced failing sections of boardwalk on Backgammon and Risk.
  • Rehabbed drainages on Operation.
Mount Pisgah | Saranac Lake
  • Park Ave Connector Trail construction has begun. You can help with the project by joining us for a volunteer work party on Sunday, 09/27 from 9:00am to 1:00pm. Meet at the Mount Pisgah parking lot.
Picture
Finding creative solutions to get the old boardwalk out of Dewey.
Picture
Map of the planned Park Ave Connector Trail.
Picture
Corridor of the planned Park Ave Connector Trail.
Craig Wood | Lake Placid
  • Rehabbed drainages on lower 19th Hole and bottom of Back Nine.
  • The drainage on Duffer’s Delight was fully rehabbed.
  • Volunteers and trail crew did some side cutting, drainage and tread improvements on the Scott's Cobble climbing trail.
  • New climbing trail finished. This trail makes lapping Green and Gold Jacket easier.
Picture
Building up a new corner, making good use of the YARDMAX and trying not to disturb Rekker's nap.
Three Sisters Preserve | Wilmington 
  • Town Connector Trail reroute – Tahawus Trails has been creating a reroute that preserves this valuable connection in anticipation of future development of residential lots.
  • Flobus – Drainages cleared; brake bumps on berms smoothed out.
Picture
Kevin and Jen raking out the new surface on the Town Connector Trail reroute.
Picture
A section of the new Town Connector Trail reroute.
East Branch Community Trails | Keene
  • Trail 8 is complete! This adaptive-friendly black diamond trail built by Peduzzi Trails opened in early September. 
  • Help us find better names for Trail 7 and Trail 8; submit your name suggestions to this form by the 28th. A poll of the finalist options will be shared on our website, socials, and via an upcoming email – make sure to vote!
Picture
0 Comments

Help Name Trail 7 & Trail 8 at East Branch

9/11/2026

0 Comments

 
Trail 7 and Trail 8 at East Branch are ready for real names and we want your ideas!

Submit your suggestions here: www.bit.ly/trail78 by September 28th.

HOW IT WORKS:
  1. Submit your suggestions. Use the form above. You can suggest names for one trail or both. Feel free to submit more than once, just fill out the form separately for each new idea. Good trail names are easy to remember and pronounce, and respectful and appropriate - that gives them the best shot at becoming a finalist! Submissions close at 11:59pm on Monday, September 28th.
  2. We pick finalists. Submissions will be reviewed to build a shortlist. We may also mix and match names from different entries.
  3. Community vote. Voting on finalists opens in early October, with the link shared on our website, email list, Instagram, and Facebook. Voting closes about two weeks later, and we'll announce the winning names!
Picture
"Trail 7"
Picture
"Trail 8"
0 Comments

Trail 8 Opens at East Branch Community Trails

9/4/2026

0 Comments

 
Picture
Trail 8 is officially open at the East Branch Community Trails in Keene, NY.

This is a black diamond trail with wicked features; definitely a "pre-ride, re-ride, freeride" situation. It is also adaptive-friendly.

The climb is bi-directional while the decent is one-way. If you'd like to do the climb but don't want to do the descent, you can take the Trail 8 "climb" back to the top of Trail 7.

We will share an updated map soon, but we didn't want to wait to let you know that Trail 8 is ready for riding. Stay tuned!

0 Comments

Trail 7 Re-Opens at East branch Community Trails

8/20/2026

0 Comments

 
Effective today, 08/20, Trail 7 at East Branch Community Trails is re-opened after a temporary closure due to nearby construction on Trail 8. During that phase of construction, heavy machinery could have rolled boulders and trees into Trail 7. Now that that phase of construction is finished, Trail 7 is open once again. 

Trail 8 is still under construction -- please help us keep construction on-track by staying off of Trail 8 until it is finished and officially open.
Picture
0 Comments

Volunteers: They're Crushing It

8/18/2026

0 Comments

 
Since our last e-news blast in mid-July, we've hosted four volunteer trail work parties led by Chris, our Trail Stewardship Leader.  We still have at least one more scheduled for this season, so if you want to volunteer with us but haven't had the chance yet, there is still time.  Not to mention, ski trail work will be starting soon...

Without further ado, a rundown of the awesome work volunteers have done in just the last couple weeks:
07/23 | East Branch Community Trails
We hosted two work sessions on July 23rd, one for the Keene Diversity Advisory Committee and another for the general public. Both sessions worked on finishing tweaks to make the existing trails at East Branch Community Trails adaptive-friendly.

Interested in learning more about adaptive-friendly riding and its impact? Don't miss BETA & Silver Birch Cycles' screening of the documentary film Best Day Ever on September 18th at The Annex, Arts Center Lake Placid.
GET YOUR TICKETS

Picture
07/25 | East Branch Community Trails
Our main focus on the 25th was to clear brush from the corridor of Trail 8. 

Reminders:
As of 08/20, Trail 8 is still under construction and not yet open for riding. Riding trails while they're still closed can make construction take even longer -- please help us get Trail 8 open ASAP by refraining from riding it for now ❤️

Update:
Trail 7 is now re-opened after a temporary closure due to nearby construction on Trail 8.

08/10 | Craig Wood, Lake Placid
Great turn out for this work party sponsored by Capisce Coffee and Espresso Bar. We lopped branches, cleared blowdown, made tread improvements, and cleaned out drainages. Especially gnarly were the culverts nearly full to the top with sediment. It's a good thing we cleaned them out --  it started to rain right as we left!
Picture
Picture
WHAT'S IT ALL FOR?
Volunteer workdays like these can vary widely in what, exactly, we work on, but they are all important to keep the trails we love in good working condition or to keep new trail construction moving forward with speed.

Some people feel a duty to give back to the trails through volunteering, while others find it satisfying and rewarding in its own right. Some feel both -- that it is a responsibility and a joy to warm your muscles doing hands-on work for the good of the trails and the people who use them. Whatever your reason for donating your time and energy, we appreciate your help to no end. Thank you, volunteers!
​
SKI SEASON IS AROUND THE CORNER
While work continues on our bike trails, the BETA team is already thinking ahead and working with the new Ski Trail Committee to plan ski trail work that needs to happen before the snow flies. You'll hear more from us soon about how we're preparing for the 2026 ski season; we won't be able to do it without your help.

0 Comments

New Features Completed at East Branch

8/17/2026

0 Comments

 
Thanks to a huge amount of work by Chris Gosling (Trail Stewardship Leader), David Hunter, David Radcliffe, Rachel Carey, and Patrick Carey (Co-Chair), we can unveil these epic new features at East Branch Community Trails. They essentially worked for an entire week on these. The result is pretty awesome.

​These three well-designed and progressive drops provide an opportunity to develop new skills that are useful on the trail.

​That is the intent behind the entire Skills Loop: allowing you to session technical features and develop your skills.

​Other features already built include skinnies and rock gardens. More features to come 🤙
Picture
Picture
Picture
0 Comments

Trail Closure Announcement + Reminder

7/31/2026

0 Comments

 
Picture
ANNOUNCEMENT -- Trail 7 to Closure to Start 08/04

Trail 7 at East Branch Community Trails, Keene, NY will close to all traffic on Tuesday 08/04 and remain closed until further notice.

Upcoming construction on the Trail 8 traverse will make Trail 7 extremely unsafe to ride or hike, as debris from construction could easily roll into Trail 7. Trail 7 will be closed to all traffic -- riders, runners, hikers -- on 08/04 and remain closed until further notice to avoid injuries to trail users.

The Trail 7 closure is expected to last 3+ weeks; please stay tuned for exact reopening date.


REMINDER -- Trail 8 Not Yet Open

Lately we've learned that some riders are ignoring trail closure signage for Trail 8, which is currently under construction. Riding trails that are under construction can be dangerous for the rider and disruptive to the builder. Riding trails that are under construction can also extend the time needed to finish construction. All parts of Trail 8 are closed now and will remain closed until the trail is completed.

Thank you for your help! We are really excited for what's to come at East Branch and hope you are, too.
Picture
0 Comments

July 2026 Trail Updates: Bridges, berms, New Builds, and More

7/14/2026

0 Comments

 
BETA's trail crew, volunteers, and contractors have already tackled many trail projects this season and some of that is highlighted below.

Lake Placid
  • Trail Crew has been working hard to build a climbing trail at Craig Wood to make lapping Green or Gold Jacket that much easier.  This is a trail that we've been planning on building for years and we hope to have it open this season.  Major kudos to Trail Crew for their excellent work here.
  • Previously, the landing zone of the 50/50 drop at Craig Wood was squarely on a section of the Back Nine trail.  We have rerouted that section of Back Nine away from the landing zone to improve safety.
  • Drainage cleared, additional drainage added, and vegetation cut back on Loop 2 at Lussi & Loggers. Drainage cleared/built in order to halt the soil erosion that has washed away so much of the tread, especially on climbing sections, and made the trail more challenging than it was ever intended.

Elizabethtown
  • Joel's Trail in Blueberry Hill, Elizabethtown is a classic, beautiful mountain biking trail that honors Joel Harwood, an Elizabethtown local who put a lot of time and effort into building and maintaining trails at Blueberry Hill.  Over time, erosion has left its mark on some sections of Joel's trail -- this season, we worked there to undo the damage and restore Joel’s to its original experience.
  • Deer Leg, a new trail completed in the 2025 season, has gotten some work done to strengthen and expand berms, improve drainage, and mitigate erosion.  One volunteer work party -- sponsored by Solace Cycles and spearheaded by their shop manager Tyler -- built up the berms on Deer Leg in order to accommodate faster descent traffic.  Another volunteer work party – sponsored by Deer’s Head Inn – removed the duff layer at the entrance to Deer Leg and improved soil erosion mitigation on Pine-winder.

Wilmington
  • BETA’s Trail Crew is working at the Flume to restore trail bridges by replacing decking and, where needed, stringers and sills.  We’d like to thank the DEC for providing all building materials for the bridge restoration.  
  • Meanwhile at the Flume, BETA hired an ADK trail crew to do tread work on Marble Mountain and other trails.
  • Volunteers have filled and capped three severely eroded sections of trail on the Good Luck side of Hardy Road: one on Make Believe and two on Safe Bet; drainage cleared and added where needed on these trails. 
  • Berms on Lost Farm at Hardy Road have been rebuilt.

Saranac Lake
  • Problem wet spots at Dewey were excavated and capped with new stone and mineral soil to improve drainage, which helps to protect the trail in the long term.
  • We've received multiple contractor bids for constructing the Connector Trail from Park Ave into Natski II at Pisgah, Saranac Lake and the RFQ is now closed.  We're lucky to have many qualified, highly skilled trail builders to turn to for work like this.

Keene
  • Construction is underway on the latest trail at East Branch Community Trails.  This new trail, currently called Trail 8, is located farther up the mountain from Trail 7.  Psst -- soon we're going to ask for community input on what to name Trail 7 and Trail 8, so start thinking up some good ones and keep your eyes peeled for the call for submissions.
  • Executive Director Glenn and Keene Town Supervisor Joe Pete have met to discuss restoration of the trailhead pavilion and expansion of the parking lot, projects we expect to break ground on in 2027.
0 Comments

Funding Boost for Mt. Pisgah and East Branch Community Trails

3/13/2026

0 Comments

 
We are so excited to announce that the NYS DEC Adirondack Park Community Smart Growth Program has awarded a combined $225k to mountain biking trail projects at Mount Pisgah and East Branch Community Trails in Saranac Lake and Keene, respectively. 

The $125k awarded to St. Armand will go towards modernizing and expanding the Mount Pisgah Trail System. This funding will make it possible to implement the 2025 Summer Trails Enhancement and Master Plan which aims to improve sustainability, enhance the user experience, and boost the local economy through mountain bike tourism. To the folks who poured countless hours into building the original trails at Mt. Pisgah, thank you for that incredible work. You created something special, lasting, and impactful in Saranac Lake. Now, some 15+ years later, we're updating those trails and adding beginner-friendly routes to the mountain so they can keep serving our community. We'd like to give a special thank you to local advocates Karen Miemis, Kris Miemis, Ezra Schwartzberg, and Chris Gosling for your tremendous work on crafting a successful grant application for this project.  

The $100k awarded to Barkeater Trails Alliance will go towards the final phase of construction at East Branch Community Trails (EBCT) in Keene.  After years of community-led advocacy, planning, and trail work, the final phase of construction at EBCT is within reach. We'll build about one mile of new trail, expand the parking lot, and restore the pavillion. This trail network is such a gem in our region and we are so excited to tie a bow on it. Of course, we'll still work at EBCT as needed -- those berms don't maintain themselves!  

We owe a huge thank you to each of our partners at the NYS DEC, Town of Keene, Town of St. Armand, and Village of Saranac Lake. With a total of $225k from the NYS Environmental Protection Fund, Adirondack Park Community Smart Growth Program and $80k in matching funds, more than $305k is being invested into biking trails in our region. Looking forward to working on these projects in the seasons to come.
Picture
Group photo (including Ezra, Chris, and Karen) from the Saranac Lake Innovative Cycling Kids' volunteer work party at Mt. Pisgah in the summer of 2025.
0 Comments

Volunteer Efforts of 2025

11/6/2025

0 Comments

 
PROJECTS
As part of our stewardship initiative, we hosted 11 volunteer trail work days across the region. 

​Some of our biggest volunteer efforts were those working on the…
  • New trail, Deerleg, at Blueberry Hill, Elizabethtown
  • Back Nine reroute at Craig Wood, Lake Placid
  • Restoration at Hardy Road, Wilmington
  • Mountain Lane reroute of the Jackrabbit Trail, Lake Placid
  • Maintaining popular trails at Dewey Mountain, Saranac Lake
  • Construction of the Skills Loop at East Branch Community Trails, Keene 
Picture
Picture
Picture
Group photo from the youth work day at Mount Pisgah, Saranac Lake
Picture
Group photo from a work party at Blueberry Hill, Elizabethtown that tackled portions of Deerleg
THANK YOU, VOLUNTEERS!
In addition to the baseline satisfaction of volunteer work days, this year we’ve had the special pleasure of welcoming a lot of new faces into the volunteer ranks.  We’ve seen a big increase in logged volunteer hours over previous years, too.  Thank you so much to each and every one of you for donating your time and energy to the trails; your hard work is much appreciated by us at BETA and surely by every rider, skier, hiker, or runner who enjoys the trails. 

​If you’ve supported BETA’s work by volunteering in any way this season, please log your hours here: bit.yl/LogHours4BETA.  Doing so helps us track volunteer efforts and apply for more grant funding for trails (DYK: volunteer labor is valued at $38+ per hour!)
Log My Volunteer Hours
THANK YOU, SPONSORS!
In addition to volunteers, we’d like to thank the businesses who sponsored work parties this season: Silver Birch Cycles, Bike ADK, The Reynolds Group, Placid Planet Bicycles, and Origin Coffee.  If you’re business is interested in sponsoring a work party next year, please contact [email protected]
Picture
Picture
Picture
Picture
Picture
THANK YOU, CHRIS!
Finally, we’d like to thank Chris Gosling for his service as our Volunteer Stewardship Coordinator over the summer.  Your efforts to connect volunteers with trail work opportunities and provide fun and rewarding experiences for everyone was greatly appreciated.  We’re sure to see you on the trail sometime soon!
Picture
Chris, center, giving an orientation at the beginning f a work party at Dewey, Saranac Lake. PC: Karen Miemis
0 Comments
<<Previous
    UPCOMING EVENTS

    Categories

    All
    Biking
    Blueberry Hill
    Cobble Hill
    Craig Wood
    Dewey
    East Branch
    Elizabethtown
    Events
    Flume Trails
    Fowler's Crossing
    Funding
    Hardy Road
    Jackrabbit Ski Trail
    Jay
    Keene
    Lake Placid
    Lussi/Loggers
    Mt. Pisgah
    Odds & Ends
    Saranac Lake
    Ski
    Staff
    Three Sisters Preserve
    Trail Conditions
    Trail Work
    Volunteering
    Wilmington
    Youth

    Archives

    September 2026
    August 2026
    July 2026
    June 2026
    May 2026
    April 2026
    March 2026
    February 2026
    January 2026
    December 2025
    November 2025
    July 2025
    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    June 2024
    May 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    June 2023
    March 2023
    February 2023
    January 2023
    November 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022

    RSS Feed

    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture

Picture

BARKEATER TRAILS ALLIANCE (BETA)
volunteer driven - member supported - human powered

Address

P.O. Box 843 - ​Lake Placid, NY 12946

Telephone

518.523.1365

Email

[email protected]
Privacy Policy
  • HOME
  • ABOUT
    • Who We Are
    • History
    • Annual Reports
    • Board of Directors
    • Staff
    • Careers
    • Community Partners
    • Blog
    • Newsletter Sign Up
    • Contact Us
  • DONATE
    • Give Today
    • Legacy Giving
  • BIKE TRAILS
    • Bike Trail Conditions
    • Ride With Gratitude
    • Wilmington >
      • Flume Trails
      • Hardy Road (Beaver Brook)
      • Three Sisters (Quaker Mountain)
    • Lake Placid >
      • Lussi Trails
      • Loggers Loops
      • Craig Wood Trails
    • Saranac Lake >
      • Dewey Mountain
      • Mount Pisgah
      • Fowler's Crossing
    • Elizabethtown >
      • Otis Mountain
      • Blueberry Hill
    • Keene
  • SKI TRAILS
    • Conditions
    • Jackrabbit Ski Trail >
      • Lake Clear JCT to Pauls Smith's VIC
      • Saranac Lake to McKenzie Pond Road
      • McKenzie Pond Road to Whiteface Inn
      • Whiteface Inn to Mirror Lake
      • Mirror Lake to ADK Cascade Trails
      • ADK Cascade Trails to Keene
  • EVENTS
  • VOLUNTEER
  • MERCH
Live Chat Support ×

Connecting

You: ::content::
::agent_name:: ::content::
::content::
::content::