BARKEATER TRAILS ALLIANCE
  • HOME
  • ABOUT
    • Who We Are
    • History
    • Annual Reports
    • Board of Directors
    • Staff
    • Community Partners
    • Blog
    • Gallery
    • Contact Us
  • DONATE
    • Give Today
    • Legacy Giving
  • BIKE TRAILS
    • Bike Trail Conditions
    • Ride With Gratitude
    • Wilmington >
      • Flume Trails
      • Hardy Road (Beaver Brook)
      • Three Sisters (Quaker Mountain)
    • Lake Placid >
      • Lussi Trails
      • Loggers Loops
      • Craig Wood Trails
    • Saranac Lake >
      • Dewey Mountain
      • Mount Pisgah
      • Fowler's Crossing
    • Elizabethtown >
      • Otis Mountain
      • Blueberry Hill
    • Keene
  • SKI TRAILS
    • Conditions
    • Jackrabbit Ski Trail >
      • Lake Clear JCT to Pauls Smith's VIC
      • Saranac Lake to McKenzie Pond Road
      • McKenzie Pond Road to Whiteface Inn
      • Whiteface Inn to Mirror Lake
      • Mirror Lake to ADK Cascade Trails
      • ADK Cascade Trails to Keene
  • EVENTS
    • Hardy Kids MTB Race 8/29
    • Slow Your Roll Rides
    • Kids' Summer MTB Series
    • Best Day Ever Film Screening 09/18
  • VOLUNTEER
  • MERCH

Hardy Kids MTB Race August 29th

7/31/2026

0 Comments

 
HARDY KIDS MTB RACE | AUGUST 29th | HARDY ROAD, WILMINGTON, NY

Don't miss this mountain bike fun ride and race for kids in pre-K through high school! Come for the race, stay for the BBQ and socialize.

​This awesome event was started 8 years ago by kids, for kids; BETA is proud to host it for the first time this year.
REGISTER NOW
Picture
Picture
0 Comments

Trail Closure Announcement + Reminder

7/31/2026

0 Comments

 
Picture
ANNOUNCEMENT -- Trail 7 to Closure to Start 08/04

Trail 7 at East Branch Community Trails, Keene, NY will close to all traffic on Tuesday 08/04 and remain closed until further notice.

Upcoming construction on the Trail 8 traverse will make Trail 7 extremely unsafe to ride or hike, as debris from construction could easily roll into Trail 7. Trail 7 will be closed to all traffic -- riders, runners, hikers -- on 08/04 and remain closed until further notice to avoid injuries to trail users.

The Trail 7 closure is expected to last 3+ weeks; please stay tuned for exact reopening date.


REMINDER -- Trail 8 Not Yet Open

Lately we've learned that some riders are ignoring trail closure signage for Trail 8, which is currently under construction. Riding trails that are under construction can be dangerous for the rider and disruptive to the builder. Riding trails that are under construction can also extend the time needed to finish construction. All parts of Trail 8 are closed now and will remain closed until the trail is completed.

Thank you for your help! We are really excited for what's to come at East Branch and hope you are, too.
Picture
0 Comments

Only 5 Days Left: BETA's 2026 Survey

7/28/2026

0 Comments

 
Only 5 days left to fill out our 2026 Survey: www.bit.ly/BETAsurvey26
Picture
Thank you to the 100+ people who have already submitted a response to the survey -- your thoughts will help direct the future of BETA. One way we'll utilize your feedback is to set priorities during our next 5-Year Strategic Plan.

Our Strategic Plan is an important guiding playbook for what matters most to BETA as an organization. It's something we refer to when we have to decide between multiple exciting programs: what is most important to tackle first, and for what reason? The Strategic Plan helps us make those choices by keeping us grounded in a shared direction.

We deeply value and appreciate your feedback. As a small thank you, folks who answer the survey by August 4th can enter to win a $100 gift card to Placid Planet Bicycles, The Mountaineer, Silver Birch Cycles, High Peaks Cyclery, or Solace Cycles. Yes, this means there will be five lucky winners!

SURVEY
0 Comments

Bridge Work at the Flume

7/28/2026

0 Comments

 
Picture
Remember the Flume bridges we mentioned a couple weeks ago?

Their makeover is complete 🤩

Earlier this month, BETA Trail Crew replaced trail bridge decking and, where needed, stringers throughout the Flume network -- awesome work Dusty and Scott!  The bridges look great.

We also hired the ADK Trail Crew to make tread improvements on Marble Mountain and other trails at the Flume. Thanks ADK Trail Crew 💪

To read more about what BETA's Trail Crew, contractors, and volunteers have achieved thus far this season, visit our latest Trail Work Update Blog.

Picture
Picture
Picture
The photo on the right shows the "Before" of one of the bridges.
0 Comments

Be Like Dan -- Volunteer Saturday

7/21/2026

0 Comments

 
Picture
Picture
Dan -- Thank you for clearing this blowdown at Lussi & Loggers, Lake Placid last week!

Blowdown at Lussi & Loggers, Lake Placid has been extra pesky this season. Volunteers like Dan who spend their free time clearing it a make a huge difference for the trail network and the people who like to ride there.

Be like Dan -- volunteer with us at East Branch Community Trails, Keene, NY this Saturday from 8:30am to 11:30am. We're clearing brush to make way for the newest trail in the network: Trail 8. We'll meet at the trailhead on Route 9N and then hike up to the worksite together. All tools are provided.

Register at www.bit.ly/BETAvolunteer
0 Comments

BETA's 2026 Survey Launches

7/17/2026

0 Comments

 
BETA members and our trails community are the lifeblood of our organization. We value your feedback and invite you to share your thoughts on what's going well and what we can do better. Fill out this survey and be entered to win a $100 gift certificate for Placid Planet Bicycles, High Peaks Cyclery, Silver Birch Cycles, Solace Cycles or The Mountaineer. Yes, this means there will be five lucky winners!

Survey results are anonymous. Once you press submit, a link will pop up for raffle entry. Winners will be selected and their names will be announced after the survey has closed.

Let your voice be heard:
2026 SURVEY
0 Comments

July 2026 Trail Updates: Bridges, berms, New Builds, and More

7/14/2026

0 Comments

 
BETA's trail crew, volunteers, and contractors have already tackled many trail projects this season and some of that is highlighted below.

Lake Placid
  • Trail Crew has been working hard to build a climbing trail at Craig Wood to make lapping Green or Gold Jacket that much easier.  This is a trail that we've been planning on building for years and we hope to have it open this season.  Major kudos to Trail Crew for their excellent work here.
  • Previously, the landing zone of the 50/50 drop at Craig Wood was squarely on a section of the Back Nine trail.  We have rerouted that section of Back Nine away from the landing zone to improve safety.
  • Drainage cleared, additional drainage added, and vegetation cut back on Loop 2 at Lussi & Loggers. Drainage cleared/built in order to halt the soil erosion that has washed away so much of the tread, especially on climbing sections, and made the trail more challenging than it was ever intended.

Elizabethtown
  • Joel's Trail in Blueberry Hill, Elizabethtown is a classic, beautiful mountain biking trail that honors Joel Harwood, an Elizabethtown local who put a lot of time and effort into building and maintaining trails at Blueberry Hill.  Over time, erosion has left its mark on some sections of Joel's trail -- this season, we worked there to undo the damage and restore Joel’s to its original experience.
  • Deer Leg, a new trail completed in the 2025 season, has gotten some work done to strengthen and expand berms, improve drainage, and mitigate erosion.  One volunteer work party -- sponsored by Solace Cycles and spearheaded by their shop manager Tyler -- built up the berms on Deer Leg in order to accommodate faster descent traffic.  Another volunteer work party – sponsored by Deer’s Head Inn – removed the duff layer at the entrance to Deer Leg and improved soil erosion mitigation on Pine-winder.

Wilmington
  • BETA’s Trail Crew is working at the Flume to restore trail bridges by replacing decking and, where needed, stringers and sills.  We’d like to thank the DEC for providing all building materials for the bridge restoration.  
  • Meanwhile at the Flume, BETA hired an ADK trail crew to do tread work on Marble Mountain and other trails.
  • Volunteers have filled and capped three severely eroded sections of trail on the Good Luck side of Hardy Road: one on Make Believe and two on Safe Bet; drainage cleared and added where needed on these trails. 
  • Berms on Lost Farm at Hardy Road have been rebuilt.

Saranac Lake
  • Problem wet spots at Dewey were excavated and capped with new stone and mineral soil to improve drainage, which helps to protect the trail in the long term.
  • We've received multiple contractor bids for constructing the Connector Trail from Park Ave into Natski II at Pisgah, Saranac Lake and the RFQ is now closed.  We're lucky to have many qualified, highly skilled trail builders to turn to for work like this.

Keene
  • Construction is underway on the latest trail at East Branch Community Trails.  This new trail, currently called Trail 8, is located farther up the mountain from Trail 7.  Psst -- soon we're going to ask for community input on what to name Trail 7 and Trail 8, so start thinking up some good ones and keep your eyes peeled for the call for submissions.
  • Executive Director Glenn and Keene Town Supervisor Joe Pete have met to discuss restoration of the trailhead pavilion and expansion of the parking lot, projects we expect to break ground on in 2027.
0 Comments

Behind the Scenes with the Executive Director

7/13/2026

0 Comments

 
Picture
When a new trail opens or a bridge is completed, it's easy to focus on the finished product. What often goes unseen are the months of planning, coordination, and relationship-building by our staff, volunteers, board members, partners, and many others that make those milestones possible.

​That's the idea behind this new column: in each newsletter I'll share a few glimpses into what happens behind the scenes.

DEC Smart Growth Grants
One recent milestone I’m happy to share was signing contracts for our DEC Smart Growth grants supporting the Mount Pisgah and East Branch Community Trails projects. Working through New York State's contracting process isn't quick or simple—in fact, it took months—but reaching that milestone unlocked $225,000 in funding that will help improve our regional trail network, far more than we've received through any previous grant program. My thanks to the Towns of St. Armand and Keene, DEC, and our state legislators for making those investments possible.

The Team at BETA
I'm fortunate to work with an outstanding team that accomplishes incredible things across our trail network and communities. An important part of my role is helping create the conditions for that success. Sometimes that means securing funding or working through administrative hurdles. Other times it's coordinating with partners to solve problems before they affect work on the ground. For example, the bridge repairs that are just getting underway in the Flume have required coordination between DEC, BETA's trail crew, and the ADK trail crew to ensure the project comes together smoothly. You'll see the results of that work in the future, but it's the behind-the-scenes coordination that rarely gets mentioned.

Ski Season Coming Soon
Finally, ski season is only four months away. Even in the middle of summer, we're already thinking ahead to winter. Setting maintenance priorities and coordinating fall work now is critical so our ski trails are ready when the snow arrives. Like many things at BETA, the work behind a great season begins long before anyone clips into their skis.

0 Comments

Volunteer Work Party -- Hardy Round 2

7/10/2026

0 Comments

 
Keep reading for BEFORE (the rain) and AFTER (the rain).

Thanks so much to the folks who came out to Hardy Road, Wilmington on July 9th to give the trails some TLC.  This was the second work party this season held at Hardy (the last one focused on berms on Lost Farm).

Our crew split into two groups, both tackling erosion in different areas on the Good Luck side of Hardy. It was a truly excellent volunteer session – we stayed safe, had fun, and also got some good work done. Bing-bing-bing, checked off everything on the list.


Unfortunately, we did get a smidge of rain. We were just wrapping up the filling in of an eroded trail section when it started to sprinkle. Hardly anything, barely reached us down on the forest floor. We kind of wanted it to reach us – it was hot, we were dirty, a little rain would probably feel refreshing. Well. To say our wants were heard and obliged is an understatement.

The sky opened up as we hiked out of the trail network. Pouring rain, nonstop big fat raindrops. No use in hurrying – there was no outrunning this deluge. Everyone was soaked to the bone by the time we returned to the parking lot. A silver lining: we were already as wet as we were going to get, so we might as well hang out in the parking lot and enjoy each other's company.

It was great working with everyone. Thanks again for spending your evening working alongside us on the trail.

If you'd like to join us for the next work party, look for upcoming dates on our Volunteer webpage and sign up here.
0 Comments

1000 Animals Recap -- What a Zoo!

7/9/2026

0 Comments

 
Wow, what a ride! Thank you so much to everyone who came out for 1000 Animals Social Athletic Club Group Ride last week, it was such a great time seeing everyone and sharing the trails. We don’t host many big group rides like this one so 1000 Animals is extra special to us. It’s always such a treat to see the trails taken over by costume-clad compatriots, whooping and hollering, smiling ear to ear. Not to mention, the BBQ was a great way to finish the evening.

Special cheers to the two folks whose very first mountain biking excursion was 1000 Animals – honored to be part of your mountain biking journey. Glad you both had a stellar time, looking forward to seeing you on the trails again.

A great big thank you to our ride leaders: Patrick, Tat, and everyone who volunteered to assist for leading us through the woods; to our event sponsors Placid Planet Bicycles and West Shore BBQ for giving us a great place to start/stop; and to each and every person who came out for the evening. Until next time – see you on the trails!
Picture
Picture
Picture
0 Comments
    UPCOMING EVENTS

    Archives

    July 2026
    June 2026
    May 2026
    April 2026
    March 2026
    February 2026
    January 2026
    December 2025
    November 2025
    July 2025
    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    June 2024
    May 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    June 2023
    March 2023
    February 2023
    January 2023
    November 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022

    Categories

    All

    RSS Feed

    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture

Picture

BARKEATER TRAILS ALLIANCE (BETA)
volunteer driven - member supported - human powered

Address

P.O. Box 843 - ​Lake Placid, NY 12946

Telephone

518.523.1365

Email

[email protected]
Privacy Policy
  • HOME
  • ABOUT
    • Who We Are
    • History
    • Annual Reports
    • Board of Directors
    • Staff
    • Community Partners
    • Blog
    • Gallery
    • Contact Us
  • DONATE
    • Give Today
    • Legacy Giving
  • BIKE TRAILS
    • Bike Trail Conditions
    • Ride With Gratitude
    • Wilmington >
      • Flume Trails
      • Hardy Road (Beaver Brook)
      • Three Sisters (Quaker Mountain)
    • Lake Placid >
      • Lussi Trails
      • Loggers Loops
      • Craig Wood Trails
    • Saranac Lake >
      • Dewey Mountain
      • Mount Pisgah
      • Fowler's Crossing
    • Elizabethtown >
      • Otis Mountain
      • Blueberry Hill
    • Keene
  • SKI TRAILS
    • Conditions
    • Jackrabbit Ski Trail >
      • Lake Clear JCT to Pauls Smith's VIC
      • Saranac Lake to McKenzie Pond Road
      • McKenzie Pond Road to Whiteface Inn
      • Whiteface Inn to Mirror Lake
      • Mirror Lake to ADK Cascade Trails
      • ADK Cascade Trails to Keene
  • EVENTS
    • Hardy Kids MTB Race 8/29
    • Slow Your Roll Rides
    • Kids' Summer MTB Series
    • Best Day Ever Film Screening 09/18
  • VOLUNTEER
  • MERCH
Live Chat Support ×

Connecting

You: ::content::
::agent_name:: ::content::
::content::
::content::